We offer all aspect of groundworks from undertaking Section 278 works as agreed by the local authority to allow access onto the site, site clearance and earth works to reshape the land and levels of the site to drainage, road, car park and footway construction and substructure works to bring your design and vision out of the ground, on firm foundations.
All our works are undertaken in the safest manner possible and completed in the most efficient methodology possible.
Saving time and budget, without compromising on quality.
As part of our continual works within the AB In-Bev UK Ltd brewery in Magor, South Wales, we designed and constructed the reinforced concrete slab to allow the client to remove waste product from the de-alcohol process.
We undertook: